Space · 01 / 06 · saved $18M
A launch operator whose monthly cadence had collapsed. We rebuilt the operating system. $18M recovered in twelve months. Name withheld.
The problem
Cadence restored
A launch operator had slipped from a monthly cadence to a scramble. Every delay burned pad time, insurance, and a board that had stopped believing the schedule. The hardware was not the failure. The operating cadence was.
How we resolved it
$18M
saved
We isolated the gate, weather, and crew into one system the floor could run at 2 a.m. The original scramble became structurally impossible. Cadence returned. The Tuesday hero is unemployed.
If we are not there
$22M / yr
still goes
If we are not there, the scramble resumes. Pad time, insurance, and a board that stops believing the schedule — about $22M a year keeps burning. The cadence does not hold without the system.
Next engagement
The leak closedBanking · saved $42M · if absent $55M / yr